Brief item 1
Approve the structure first
Use complete products to check the drawing, insert and opening. Record structural changes before releasing the final artwork so text and decoration follow the correct panels.
Brief item 2
Control later approvals
Review colour and finish on the proposed material, then identify the approved sample and artwork combination for production. List unresolved changes and their owners rather than assigning a universal schedule to all projects.
Further reference views


Turn the method into a sample brief
Bring the result of “approve the structure first” and “control later approvals” to the packaging discussion. Share the real contents, relevant drawings and the decision still to resolve.
Discuss this packaging task → (opens in a new tab or window)WhatsApp
