Decision 1
Identify the manufacturing drawing
Confirm the dieline revision and mark inside, outside, top and base before applying artwork. Keep structural changes separate from graphic edits so a designer cannot unknowingly change a cut or score.
Decision 2
Package the artwork files
Supply linked images, font or outlined-text instructions and colour references in the agreed format. Check an assembled proof for orientation and folds, then record which file revision is approved for the Hanoi-bound order.
Turn the method into a sample brief
Bring the result of “identify the manufacturing drawing” and “package the artwork files” to the packaging discussion. Share the real contents, relevant drawings and the decision still to resolve.
Discuss this packaging task → (opens in a new tab or window)WhatsApp
